top of page
Troncon route mare rouge.jpg

Support for the Implementation of the Management Plan for Unit 2 of the Forêt des Pins National Natural Park.

Mare-Rouge, Northwest | Haiti

Project summary

This sub-project to "construct 1,000 linear meters of concrete strips (Ravine Rose-Caporal axis from Carrefour la Judée to Mare-Rouge)“ is part of a collaboration between AHAAMES and HELVETAS via the project ”Support for the Implementation of the Management Plan for Unit 2 of the Pines Forest National Park," funded by the SDC and implemented by HELVETAS-ANAP/MdE. 
AHAAMES has been commissioned for the period from April 27 to September 27, 2020, to carry out the construction of 1,000 ml of road, which should contribute to the promotion of ecotourism in this protected area. 

Objectives Related to the Assigned Mandat

-

 Improve access to the road leading to Mare-Rouge, a locality in Unit II of the Pine Forest, by installing infrastructure such as 1-meter-wide, 20-centimeter-thick concrete strips, 40-centimeter shoulders, 3-meter-long solid concrete sections, and, if necessary, drainage ditches;
– Develop technical proposals that include, in addition to the concrete strips and solid concrete structures already proposed in the terms of reference, other types of infrastructure such as rock paving, taking into account the actual site conditions and available resources.
​
As part of this subproject, AHAAMES’s mission was to carry out the main activities outlined below. This involves road construction work organized into four sections.

​

Andréus Section
Construction of 60 ml of hydraulic concrete strips in areas with slopes; Construction of 210 ml of rock masonry strips in flat [1] and/or gently sloping areas;
Construction of 1 gully in areas prone to gully formation upstream of the road;  Filling of the 60-cm gaps between the strips;
Construction of 40-cm shoulders;

​

Tronçon Ti Méprise

Construction of 70 ml of hydraulic concrete strips in ramp areas;  Construction of 454 ml of rock masonry strips in flat and/or gently sloping areas;
Construction of 7 drainage ditches in areas prone to gully formation upstream of the road;  Filling of the 60 cm gaps between the strips;
Construction of 40-centimeter shoulders;

​

Tronçon Yvane

Construction of 57 ml of concrete strips in ramp areas;
Construction of 20 ml of solid concrete in ramp and curve areas;
Filling of the 60-cm gaps between the strips;
Construction of 40-cm shoulders;

​

Saint-Rival Section
Construction of 15 ml of hydraulic concrete strips in ramp areas; construction of 114 ml of rock masonry strips in flat and/or gently sloping areas;
Construction of 1 drainage ditch in areas prone to gully formation upstream of the road; Filling of the 60 cm interior gaps between the strips;
Construction of 40-cm shoulders;

​

Institutions/Stakeholders/Roles​
Implementing Organizations: Haitian Association for Agricultural, Medical, Educational, and Social Assistance (AHAAMES)
​
Partners: SDC-HELVETAS-ANAP/MdE​
​
Location: Haiti, North Department, Môle-Saint-Nicolas 
​
Project Duration: 5 months

AHAAMES is a non-profit non-governmental organization (NGO) registered with the IRS under the name AHAMES and recognized as a 501(c)(3) organization. The organization is also registered in Haiti under the name AHAAMES, as a non-profit NGO.

Useful links

About

Our themes

Support us

News

Contact

 

Address :

Haiti: Fontamara, 27 Dr. Douyon Street #4, Port-au-Prince, Haiti, WI

United States: 1921 Abbey Ridge DR. Dover, FL 33527

info@ahaameshaiti.org

 

Stay connected.

© 2025 ahaameshaiti, Tous droits réservés

bottom of page